Fulani Infrastructure Company
The Open-End pile can be installed with a MobilRam, Hanging Vibratory Hammer from a Crane or Excavator.
The Open-End Friction Pile Products were designed, engineered, and field tested by an National Industry Leading Consulting Engineering and Scientific research firm. Their team conducted stringent field tests to verify and validate design values of the products.