The Open-End pile can be installed with a MobilRam, Hanging Vibratory Hammer from a Crane or Excavator.

The Open-End Friction Pile Products were designed, engineered, and field tested by an National Industry Leading Consulting Engineering and Scientific research firm. Their team conducted stringent field tests to verify and validate design values of the products.

Time Savings = Cost Savings

01

FIG’s Open-End Friction Pile reduces the overall project schedule with new methods of installation.

02

Friction Pilesare installed with in hours and is immediately ready for structure erection.

03

Friction Pilereducesman hours downtime & multiple mobilization.

Advantages of Friction Pile

01

ZERO CONCRETE! No concreteis used for installation the Friction Pile.

02

Ideal for limited access,congeste dareas, remote locations, and hazardous soils

03

Friction Piles may be designed to all owthe pile to be exposed accommodating terrain variations.

04

Friction Piles are REMOVABLE and can be relocated.

Corrosion Protection

01

All Products are Hot-Dipped Galvanized for corrosion protection.

02

Cathodic protection is applied to the Friction Pile.

03

Other high-tech coatings are available for protection in acidic soils.